Flexlink YOUTILIZE User Manual Page 87

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 86
Providing production
efficiency
Page 87 of 125
Equipment Measurement History Gauge
Filters Supported – Process Point
The Equipment Measurement Gauge does not use any calculations. The gauge only displays data
provided by the equipment it is connected too.
Equipment Measurement History Chart
Filters Supported – Process Point
The Equipment Measurement History Chart does not use any calculations. This gauge only displays
historical data based on measurements provided by the equipment.
Utilization History and Pie Chart
Filters Supported – Process Point
The Utilization gauge takes time difference between states changes to sums each state to create a
percentage based on the time frame specified.
Example
Running 3:06 PM
Stopped 3:11 PM
Starved 3:16 PM
Running 3:21 PM
Starved 3:26 PM
Running 3:31 PM
Blocked 3:36 PM
Running 3:41 PM
Stopped 3:46 PM
Sum Times
Running 3:06 PM Æ Stopped 3:11 PM = 300 Seconds Running
Stopped 3:11 PM Æ Starved 3:16 PM = 300 Seconds Stopped
Starved 3:16 PM Æ Running 3:21 PM = 300 Seconds Starved
Running 3:21 PM Æ Starved 3:26 PM = 300 Seconds Running
Starved 3:26 PM Æ Running 3:31 PM = 300 Seconds Starved
Running 3:31 PM Æ Blocked 3:36 PM = 300 Seconds Running
Blocked 3:36 PM Æ Running 3:41 PM = 300 Seconds Blocked
Running 3:41 PM Æ Stopped 3:46 PM = 300 Seconds Running
Total Times
Running = 1200 Seconds
Stopped = 300 Seconds
Starved = 600 Seconds
Blocked = 300 Seconds
Percentages
Running = 50%, Stopped = 12.5%, Starved = 25%, Blocked = 12.5%
State History Chart and Label
Filters Supported – Process Point
Page view 86
1 2 ... 82 83 84 85 86 87 88 89 90 91 92 ... 124 125

Comments to this Manuals

No comments