Flexlink YOUTILIZE User Manual Page 114

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 113
Providing production
efficiency
Page 114 of 125
Appendix B
Service Monitoring
The following describes what needs to be done for every conveyor in the system.
Initial measuring data
Gap, chain-beam, top
(Gap_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_top
Thickness of chain top (Chain_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Chain_top
Gap, chain-side plate, idler end (Gap_idler)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_idler
Thickness of tab (Chain_tab)
Formatted: Danish
Page view 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 124 125

Comments to this Manuals

No comments